|
|
This system has Web interface. Primary function is production calculation and well stock analysis:
- Creation of oil-field information gathering system and forming of a geologic-technological database.
- Accumulation and processing of information from SCADA.
- Accounting of oil and gas production by wells and oil-field facilities.
- Well stock working analysis.
- Converting to actual output.
- Forming of regulation reports.
- Maintenance of "Well record".
- Information supply of hydrodynamic models creation.
|
|
|
Building of regulation maps oil-field development. Functions automation services of development departments
for building of regulation map of oil-field development: current and cumulative production maps, isobar maps, calculation and analysis of average pressure dynamics
for various pool zones.
|
|
|
Accounting and analysis of field pipelines.Main functions: systematization of all information of
field pipelines of enterprise,
accounting and analysis of failures, monitoring of technical state, maintenance of audit schedule,
calculation of critical wall thickness, pipeline categories, normative useful life.
Execution of corrosive-hydraulic calculations
|
|
|
Unified gathering of on-line information. Automated gathering of data from remote clients,
clients notification about processing and control results, control of completeness and consistency of
transmitting information.
Aggregate data transfer to the next level of company. The System's user defines: composition and content of input forms, content of figures, algorithms of figures control and calculation. Building of arbitrary output forms. Usage of specific "oil" definitions for building of output documents.
|
|
|
System of operational planning, the account and the control of repair work on the wells.
The information system features the following key functions:
- well repair work planning and monitoring;
- information well repair work entry;
- results registration of changes in design of a well and of the mounted equipment during work;
- operation breakdown planning on a well;
- cost-effectiveness analysis of the works carried out on a well;
- generation of various documents on the planned and repair work performed on the well (work orders, inspection certificate and etc.).
|
|
|